Applications tied to the site
Partial coverage23 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
23 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 128 decisions within 5 km, 23 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
23 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
23 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
1) Demolish existing canopy at the front of the cheese processing & storage building, 2) to construct extensions at the front, rear and sides of the existing cheese processing & storage building, 3) services and plant area on the new roof at the rear including solar panels, 4) fire escape staircases from the lower ground floor at both sides of the building, 5) carparking, 6) signage & 7) all associated services & site works. A Natura Impact Statement has been submitted as part of the planning application.
Retention of new entrance and loading bay at the side of the building to the existing crumb room preparation area.
(1)Demolition of: (i) Existing dis-used tyre centre, (2)Removal of (i) Existing bus shelter, (3)Retention of: (i) Demolition of part of dis-used tyre centre, (ii) Alterations to site levels with provision of hardstanding areas used for the open storage of tyres and a container used for storage of tools, (iii) Existing entrance gate, (iv) Existing entrance and (4) Permission to: (i) Construct new building for use as a tyre centre, (ii) Construct new vehicular entrance, (iii)Construct earthen bund, (iv)Construct staff and customer car parking, (v) Construct access route from car parks to tyre centre including stepped access, (vi) Erect new wall and fence between site and applicants adjacent site, (vii) Erect post and chain fencing along roadside boundary, (viii) Erect new palisade fencing on site, (ix) Installation of onsite waste water treatment system (x) Relocation of existing entrance gates on site, (xi) Re-surface existing site with concrete & tarmac, (xii) Erect stock proof fencing to create a 25m Buffer Zone to North West corner of site and (xiii) all ancillary site works including the installation of a hydrocarbon interceptor
Planning Permission is sought for (1) The demolition of remainder of existing dis-used tyre centre, (2) The Retention of: (i) Demolition of part of the dis-used tyre centre, (ii) Alterations to site levels with provision of hardstanding areas used for the open storage of tyres and 2 no. shipping containers used for storage of tools, (iii) Existing entrance gate, (iv) Existing entrance, and (3) Permission to: (i) Construct new building for use as a tyre centre, (ii) Construct new vehicular entrance, (iii) Construct Earthen bund, (iv) Construct staff and customer car parks, (v) Construct access route from car parks to tyre centre including stepped access, (vi) Erect new wall and fence between site and applicants adjacent site, (vii) Erect post and chain fencing along roadside boundary, (viii) Erect new palisade fencing, (ix) Installation of onsite waste water treatment system, (x) Relocation of existing entrance gates to site, (xi) Re-surface existing site with concrete & tarmac, (xii) Erect stock proof fencing to create a 25m Buffer Zone to North West corner of site (xiii) The installation of 4 no. shipping containers for use as storage, and (xiv) All ancillary site works including the installation of a hydrocarbon interceptor. This application is a repeat submission for planning permission which has recently lapsed (17/4883).
The installation of a rooftop photovoltaic solar panel array totalling 1172 sqm and all associated site works.
I) demolition of part of the existing canopy at the front/side of the existing shop/forecourt and demolition of the existing trolley bay at the side of the existing shop ii) to construct extension to the front and side of the existing supervalu shop consisting of new entrance, coffee dock and trolley zone with side entrance along with new canopy along part of the western side of the shop and iii) demolish existing wall between existing carpark at the west and extend the carparking area into the storage yard at the side/back of the complex and construct new wall/fence between the carpark and the storage yard all within their existing retail complex. Extension of Duration to Permission granted under Pl.Ref.No. 17/7335.
The brief summarizes the pattern across all 128 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/7045The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief