Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 437 decisions within 5 km, 6 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Demolition of existing calf house construction of calf/calving house to include slatted slurry storage, farmyard manure slab and all associated site works.
To construct a new dwelling house
To construct a storey and a half type dwelling and the installation of a waste water treatment unit, together with all associated site works.
Permission for the construction of a two-storey detached dwelling house, The construction of a one-storey detached domestic garage, The Construction of a site entrance, The installation of a private well, the installation of a wastewater treatment unit and associated soil polishing filter and all ancillary works.
The construction of – a) a cattle underpass beneath a public road, b) associated effluent run off tank, c) all associated ancillary siteworks.
Partially demolish existing dwelling and attached outbuilding and construct extension to dwelling, replace septic tank and all associated site works.
The brief summarizes the pattern across all 437 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/7364The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief