Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 1,099 decisions within 5 km, 4 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
Erection of single storey Madagascan Wildlife interpretative building, 2 No buildings to house Madagascan Lemur, together with all associated site development works.
To erect a single storey building to be known as monkey house 9, and which will accommodate howler monkeys and pelicans, together with all associated site development works. A Natura Impact Statement will be submitted to the Planning Authority with this application.
Permission for the erection of a new steel-framed building to house a group of Siamang Gibbon. This new building will replace the small existing timber Siamang Gibbon building which is to be demolished. The development includes the construction of a new pedestrian pathway to the new building, the installation of a foul sewage holding tank and all associated site development works. A Natura Impact Statement (NIS) will be submitted with the application.
Demolish an existing monkey house and to construct a replacement monkey house together with all associated site development works
To erect a new single storey animal housing building for the existing Spider Monkey group in the park. The present animal building in the compound is now too small, and no longer adequate for this use. The development will also include all associated site development works including installation of an underground foul effluent storage tank, and a raised net tunnel over the internal park roadway to allow the animals to access the building directly from the compound. A Natura Impact Statement will be submitted to the planning authority with this application.
Construct a bird-viewing shelter together with associated access pathway and site development works, and also for permission to construct a boardwalk through wetlands.
The brief summarizes the pattern across all 1,099 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18/7367The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief