Applications tied to the site
Partial coverage24 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
24 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 812 decisions within 5 km, 24 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
24 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
24 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
1) Construction of retaining wall along front boundary of site, and 2) Formation of vehicular entrance on to existing private road.
Outdoor deck and steps to rear of existing dwelling with all associated site development works
Permission to Retain: The existing roadside boundary walls, the lift building as constructed, the external steel stairs associated with the car deck and lift building, the change in ground levels at lift building, the external steel steps to west of site, the western cliffside deck; the western shed, and alterations to all elevations of the dwelling. Permission for development is sought for: fabric upgrades, modifications to fenestration and external finishes, internal modifications, and part change of use from storage to home gym/office of the lift building; fabric upgrades, modifications to fenestration and external finishes, and extension to the existing dwelling house; amendments to roadside boundary walls to accommodate sightlines, privacy screen at roadside, upgraded landscaping, PV covered carport at parking deck, new wastewater system and all associated site development works.
To carry out alterations, erect a single storey extension and raising of roof to create first floor living accommodation all to existing dellinghouse
Permission to carry out alterations, erect a single storey extension and raising of roof to create first floor living accommodation, providing balcony to northern elevation, widening of existing entrance, elevation alterations and all associated site works to existing dwelling house.
Demolition of existing single storey dwellinghouse and construction of two storey dwellinghouse and associated siteworks
The brief summarizes the pattern across all 812 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18/7385The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief