Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 116 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a new detached dwelling house, waste water treatment plant and all associated site works
The construction of a dwelling house and all associated siteworks (Change of plan and change of site boundary from previously permitted planning reference no. 24/19)
Construction of a dwelling house and all associated siteworks
Construct extensions to the side and front of existing dwelling with alterations to existing front and rear elevations with associated site work
Construct a cattle house with three no. slatted slurry tanks and carry out all associated site works
For development consists of amendments to permitted application, Reference No: 19/00463, to alter the permitted site boundaries, and dwelling position for the construction of a new detached dwelling house, wastewater treatment plant and all associated site works
The brief summarizes the pattern across all 116 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/746The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief