Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 97 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development consists of retention of a storage area within an application area of c. 1.3Ha.. The area that forms part of this planning application lies to the southwest of an adjoining permitted hard rock quarry (Plan File Ref. No. 02/5740) and is used to store material arising from quarry processing activities. The material stored in this area consists of silt (fines) arising from the crushing and screening process at the adjoining permitted quarry
Dwelling House, an effluent treatment system and associated site works
The development consists of a lateral extension of c.4 hectares to the existing quarry area, permitted under Plan File Ref. no. 02/5740, to give an overall extraction footprint of c.10.9 hectares; deepening of the extraction area by a further 20 metre bench from the current permitted floor level of 148m AOD to a final depth of c. 128 m AOD; an overburden storage area and quarry stockpile storage area; restoration of the site to natural habitat after - uses; all related ancillary site works within an overall application area of 26.5 hectares, and all for a period of 35 years. The application is accompanied by an Environmental Impact Assessment Report (EIAR).
To construct a dwellinghouse and domestic garage, install a sewage treatment system and undertake all associated site works.
Acceptance, storage and crushing of waste bituminous mixtures (tarmacadam) from other external sources for recycling and re-use consisting of storage and crushing of waste. The crushed materials will be utilised in the production of new tarmacadam. Proposed works include concrete slab, petroleum/oil interceptor and percolation area
The development will consist of the erection and operation of an asphalt plant (Stack height 20 meters) within an overall application area of 0.15 ha. at the existing quarry landholding.
The brief summarizes the pattern across all 97 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19/274The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief