Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 49 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To retain green roof tile on dwelling house and bay window on the western elevation
Permission for change of use of attached garage and loft to habitable space including alterations to building to include raising roof. Permission also sought for new porch and new detached domestic garage/store and including all associated site works
Permission for removal of existing unauthorized container, storage shed and portacabin structures and for construction of a new detached building in-lieu of same for use as a childcare facility. Permission also sought for connection of proposed facility to all existing services to include existing sewerage waste water treatment system and for all associated site works. Permission is also sought for retention of a prefabricated office building
Erection of 6 no. 18m high floodlights and associated site works
Outline permission for construction of dwelling house, installation of wastewater treatment system and all associated site works
Outline permission for construction of dwelling house, installation of wastewater treatment system and all associated site works
The brief summarizes the pattern across all 49 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19/367The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief