Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 333 decisions within 5 km, 4 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(i) the demolition of existing sun room and lean-to structure on an existing dwellinghouse; (ii) the construction of a single storey extension [entrance porch] and a two storey extension incorporating a glazed two storey link to said dwellinghouse; (iii) the construction of alterations to said dwellinghouse to include the raising of existing walls and roof and the installation of 2 no. roof-lights; (iv) the retention of and carrying out of alterations to an existing two storey ancillary residential building to include the raising of existing walls and roof and a connection at ground and first floor levels to the proposed extension to said dwellinghouse; (v) the retention and change of use of a second existing detached two storey ancillary residential building and its conversion to a granny flat on the ground floor with carer's accommodation at first floor level (vi) the installation of a septic tank and percolation area to replace an existing tank and percolation area and (vii) all associated site works to include waste water treatment system and surface water drainage works, a new car parking area and related landscape works.
Permission to renovate and extend existing dwelling house, permission to construct a two storey extension to said dwelling house to be used as ancillary living accommodation including a ground floor connecting door to existing ancillary living accommodation and carry out all associated site works, (alteration to plan previously granted under planning ref no. 19/00038
Permission for single storey extension to existing dwelling house and all associated site works
Renovation and refurbishment of existing dwelling including: (1) Demolition of existing rear conservatory extension and side garage extensions to existing dwelling; (2) Construction of new single-storey extension in lieu of existing garage extension, together with new front entrance canopy and surround. (3) Elevational changes to existing dwelling; (4) Construction of new detached domestic garage: (5) Installaiton of new wastewater treatment system; and (6) All other associated ancillary siteworks
Construct a dwellinghouse, domestic garage, install a waste water treatment plant and to undertake all associated site works
Planning Permission for alterations and extensions to an existing dwellinghouse; to include the demolition of an en-suite shower room extension, and all associated site works
The brief summarizes the pattern across all 333 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19/38The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief