Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 330 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A) Decommissioning of existing borewell b) Installation of new borewell c) Demolition of agricultural storage building d) Construction of agricultural building to include slatted livestock housing e) Construction of apron and walled silage pit along with associated site works.
Construction of domestic garage together with all other site works
A 10 year Permission is sought for a solar farm with a total area of circa 161 hectares. The solar farm will consist of solar panels on ground mounted frames, 23 no. single storey electrical inverter/transformer stations, 6 no. single storey spare parts containers, 3 no. Ring Main Units, 7 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L62031, L6203, R619, L6207, L22012 and L2204 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 4 no. stream/drain deck crossings, 6 no. horizontal directional drill crossings ( under watercourse/drains/public road), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 7 no. entrances from L62031, L6203, L22012, L6398 and L2204 local roads. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration.
Permission for retention of change of use of existing 2 no. outbuildings to 2 no. residential living accommodation units ancillary to the main dwelling and to install a new percolation area to serve existing treatment unit.
Permission for retention of three sets of glazed double doors in place of windows and an enlarged single-storey glazed porch on the north-east elevation, and three windows and three velux roof windows on the south-west elevation, along with a 500mm increase in the ridge height of the sunroom of an existing dwelling house
Permission to construct a dwelling house, effluent treatment system & all associated site works
The brief summarizes the pattern across all 330 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19/4004The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief