Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 131 decisions within 5 km, 4 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a slatted unit, feed passage and associated works.
To construct a dwelling house, garage, on-site waste water treatment unit and all associated site works.
The construction of a single storey detached dwelling with converted attic/first floor and a single storey detached garage including all associated site works, drainage works and associated landscaping
Retention of dwellinghouse as constructed (previously granted permission under planning permission ref. 10/4077 and extended under planning permission ref. 14/6146).
Retention of changes to the existing dwelling including amended roof structure, change in internal layout and alterations to the rear and side elevations.
The construction of single dwellinghouse, garage, carport, on-site wastewater treatment system together with all ancillary site development works.
The brief summarizes the pattern across all 131 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19/4170The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief