Applications tied to the site
Partial coverage22 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
22 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 884 decisions within 5 km, 22 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
22 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
22 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a warehouse building for storage and distribution, staff facilities & offices, parking & yards, entrance off existing estate road and all associated site works.
To construct a warehouse building consisting of five separate units for light industrial / warehouse use, parking and yards, entrance off existing estate road and all associated site works.
Alterations to existing warehouse / light industrial unit to include ancillary services: 1) lobby, staff canteen and w.c. facilities to ground floor, 2) construction of a first-floor mezzanine to include offices and meeting room, 3) alterations to elevations, signage, and all ancillary site works
Construction of a new part first floor with mezzanine (totaling 150 sq.m gross floor space) to provide for a canteen, 2 no. offices, meeting room and mezzanine storage area; the provision within the existing ground floor (totaling 218.4 sq.m gross floor space) of storage area, testing/calibration room, warehouse, 2 no. toilets and shower room, and 2 no. offices; and external elevation upgrades to include glazed entrance door with additional glazed windows (part spandrel/opaque glazing) and glass canopy along the southern elevation, signage along the southern elevation, and glazed windows (part spandrel/opaque glazing) along the eastern elevation; all at this site of approximately 0.0024 hectares.
The construction of a secure heavy goods vehicle parking compound for the short term parking of rigid trucks and artic trailers. The development will consist of (1) the construction of a new hardstanding surface, (2) the erection of palisade fencing, (3) the construction of a secure gateway, (4) the construction of concrete boundary walls, (5) the alterations to existing entrance, (6) the installation of a storm water hydrocarbon interceptor and (7) all associated site works.
Demolition of existing dwelling house and construction of 3 no. detached dwelling houses, alterations and widening of existing site entrance, new roads/services and all ancillary site development works for Extension of Duration under Pl.Reg.No. 18/5778.
The brief summarizes the pattern across all 884 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19/4205The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief