Applications tied to the site
Partial coverage21 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
21 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 392 decisions within 5 km, 21 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
21 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
21 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) The construction of single storey extensions to the west and south of an existing dwelling, alterations to existing elevations, modifications to the existing internal layout and all associated site works (2) The retention of a sunroom at ground floor level and an attic conversion to bedroom accommodation including a dormer extension with window to south and first floor windows on east and west elevations of existing dwelling (3) The retention of a domestic garage.
The development will consist of: a readymixed concrete plant (comprising a feed ramp, 5 no. bins, a batch conveyor, a mixer house and 2 no. cement silos) with associated concrete reclaimer unit, electricity supply and switch room building (47sqm), lab/store building (14sqm), bunded fuel tanks, hard and soft landscaping and all other site excavation, infrastructural and site development work above and below ground. The proposed development will operate from 07.00hrs to 18.30hrs Monday to Friday inclusive and from 08.00hrs to 16.00hrs on Saturdays inclusive (no operation on Sundays, Bank and Public holidays). Permission is also being sought for occasional out of hours operation, up to a maximum of 40 no. occasions per year (excluding Sundays, Bank and Public holidays), outside of normal operating hours. There is no changes proposed to the permitted pit operating hours.
Extensions and alterations to dwellinghouse to include two storey extension to rear, orangery extension to side, portico extension to side, replacement of existing dwellinghouse roof, alterations to existing windows, installation of new waste water treatment tank and all associated site works to existing two storey dwellinghouse.
To construct a dwellinghouse
Construct a dwelling house.
To construct a dwelling and domestic garage and installation of wastewater treatment unit, percolation area and all associated siteworks
The brief summarizes the pattern across all 392 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19/4385The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief