Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 714 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Installation of new rooflight windows on front elevation of dwellinghouse and retention of detached domestic garage as constructed
Construction of dwellinghouse and domestic garage and associated site works
1. Demolish existing timber Extension to the rear (north) of the existing cottage, 2. Restore existing old cottage – repair roof, add two roof lights to the northern roof, replace windows with new, build new porch (replacing old) to the south of the cottage. 3. To the north of the existing cottage, construct a new one-and-a-half storey dwelling extension, with single storey ‘link’ to the cottage, 4. Decommissioning existing well, drill and install a new well within the site, 5. Decommissioning existing septic tank and install a new septic tank and percolation area within the site, 6. Carry out all associated site works.
10 Year Planning permission for a solar farm with a total area of circa 9 hectares. The solar farm will consist of solar panels on ground mounted frames, 2 no. single storey electrical inverter/transformer stations, 2 no. containerised energy storage modules, 1 no. single storey spare parts container, 1 no. medium voltage control/switching substation (comprising either single-storey building or 2 no. modular units), 1 no. weather station, underground electrical ducting and cabling within the development site, security fencing, CCTV, access tracks, temporary construction compound, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 1 no. existing entrance from the L7247. The operational lifespan of the solar farm will be 40 years and planning permission is requested for the duration.
Conversion and extension of ground floor of existing farm building to an independent dwelling unit, as ancillary family accommodation, decommission existing septic tank, install new wastewater treatment unit and all associated site works.
Construction of dwellinghouse together with wastewater treatment unit and sand polishing filter, new site entrance and all other associated ancillary site works.
The brief summarizes the pattern across all 714 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19/4489The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief