Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 263 decisions within 5 km, 5 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention of the existing extensions and alterations to the existing crèche playschool/preschool as constructed with all associated site and ancillary works.
Permission for the retention of the change of site boundaries and the change of the elevations of the existing dwelling as granted under planning ref. no. 01/2457.
Construction of one two-storey dwelling complete with attached double garage and annex which is to be utilised as a separate dwelling ancillary to the main dwelling, all associated site works including installation of septic tank and percolation area and access road to the dwelling(s) utilising existing domestic and field access.
Permission to construct a new single storey light industrial/warehouse distribution building with ancillary office space to serve existing supply chain business. As part of the development, the applicant is seeking permission for the demolition of (a) building containing 13 no. light industrial units and (b) the demolition of an unauthorised light industrial link/infill building. The development will include car parking, cycle parking and motorcycle parking, trailer set down area, yard area, dock levellers, access roads, retaining walls, overground water storage tank and all associated site development works including site lighting, site drainage systems, SUDS and landscaping works. In addition to these items, we are also seeking permission to install rooftop photovoltaic solar panel arrays consisting of approximately 912 m2 of solar panels to be fixed to the south western roof slopes of the proposed new single storey light industrial/warehouse distribution building.
Development of agricultural land and construction of six dwellings complete with all associated site works including installation of septic tanks and percolation areas, access road and alteration works to improve the existing domestic and field access.
Permission to construct a new 520m2 single storey loading dock extension onto an existing light industrial/warehouse distribution building to serve the existing supply chain business. The development will include a minor alteration to the existing northern boundary along with: a) The addition of 9 no. lorry dock levelers onto the rear of the proposed extension with canopy. b) Demolition and relocation of the existing graded ramp from the existing rear elevation onto the side elevation of the proposed extension with canopy over. c) Addition of 3 no. lorry dock levelers onto the rear elevation and all associated site development works including site lighting, site drainage systems, SUDS and landscaping works.
The brief summarizes the pattern across all 263 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19/4616The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief