Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 386 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention of 2 no. bay windows to front and minor elevational changes to dwelling permitted under Pl.Reg.No. S/612/88, Retention of 3 no. domestic sheds, canopy for domestic storage and change of location and layout of vehicular entrance.
(i) Construct a 4-bay double slatted cattle shed unit (ii) 12-bay calf slatted unit (iii) Associated site works all to his existing farmyard.
Retention of 2 no. domestic garages and canopy for domestic storage
Construct a two-storey dwelling house, new vehicular entrance, install a wastewater treatment system and percolation area and all associated site works.
Permission to construct a dwelling, garage and associated site works (change of plan to that permitted under Pl. Reg 19/5340. The proposed development will be accessed via an existing entrance onto the public road.
The construction of a dwelling and garage, waste water treatment plant and all ancillary landscaping and site development works. The proposed development will be accessed via an existing vehicle entrance onto the public road.
The brief summarizes the pattern across all 386 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19/4786The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief