Partial coverage11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 487 decisions within 5 km, 11 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) the demolition of existing chimney to east of dwelling house, (2) the retention of east extension to original dwelling permitted under planning ref 74/3287A, (3) Retention of alterations of elevations to original dwelling permitted under planning ref 74/3287A, (4) Retention of converted attic to habitable living space and (5) all ancillary works.
Construction of a new effluent treatment system consisting of a mechanical aeration treatment unit and polishing filter within the curtilage of property (to replace existing off site septic tank system) to serve dwelling house.
Permission for extension and alteration to the existing dwelling house as follows: partial demolition of the 1st floor bedrooms pitched roof and construction of 1st floor extension, construction of ground floor new entrance, lobby and stepped approach, 1st floor master bedroom suite and home office, construction of covered area/overhang and raised patio/planter to front of house, conversion of existing side garage into home studio and storage, and addition of roof lights internal renovations throughout, installation of drain and associated soakpit at site entrance. Installation of surface water soakpit, wastewater treatment system, sand polishing module etc. Excavations, construction of new steps and raised landscaped areas to rear and all associated site works, services and landscaping
Permission to construct a new front entrance comprising of a hip roofed entrance porch to front south side of dwelling.
Construction of a replacement septic tank and raised percolation area to replace existing septic tank and soakpit to serve their existing dwelling Knockrua.
Permission for a package wastewater treatment plant, percolation area and associated pipework and to decommission the existing septic tank and soakpit.
The brief summarizes the pattern across all 487 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19/4931The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief