Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 308 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a detached dwelling and a detached garage with store area, new vehicular site entrance, new biofiltration treatment unit, new potable well and all associated site works and boundary treatments
Construction of a single storey dwelling with attached garage and store area, new vehicular site entrance, new biofiltration treatment unit, new potable well and all associated site works and boundary treatments
Permission for retention of a) external storage area storing modular sections of prefabricated buildings and b) a single storey building for the storage/repair of prefabricated modular buildings, c) continuance of use of the existing vehicular access from public road and associated site works.
Permission for retention and continued use of existing processing plant and related water management system, the existing concrete plant, ancillary buildings (site office 63 sq.m), 3 no. welfare portacabins (32 sq.m, 23.5s q.m & 22.0 sq.m), 4 no. storage buildings/containers (15 sq.m, 10 sq.m, 6 sq.m & 5 sq.m), 2 no. garages (76 sq.m & 76 sq.m), ESB Substation (26 sq.m), covered vehicle storage (220 sq.m), site access and all related ancillary facilities (wheelwash, fuel storage tank, weighbridge etc), permitted under Pl.Reg.No. S/02/1023), all for a duration of 10 years. 2) Permission for proposed development comprising removal of existing disused fuel storage tanks, recycling of c.15,000 tonnes of concrete for use in concrete production, importation of 25,000 tonnes of sand & gravel for processing, importation of c. up to 20,000 tonnes of soil and stone per year (under Article 27) for phased site restoration with a revised phasing plan and completion of restoration of the overall site to agricultural use. Permission is sought for eight years plus two years final restoration, total of 10 years. All within an application area of c.21.4 hectares.
Porch to front of existing dwelling
Construction of two number 6,400 square metre soccer pitches, one number 1,500 square metre hard-surfaced multi-purpose playing area, 38 car parking spaces, new vehicular entrance and all associated site works.
The brief summarizes the pattern across all 308 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19/4959The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief