Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 856 decisions within 5 km, 10 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Demolition of existing house, shed, outhouse garage and partial front boundary wall, removal of existing septic tank and construction of 2 no. houses, installation of 2 no. waste water treatment systems, additional new entrance and driveway and all associated site works.
The construction of a new dwelling to the rear of house and to renovate the existing house. The works shall include the demolition of the existing garage, front walls and conservatory, rear out house, utility and internal demolition. Alterations to the driveway, removal of garden shed, partial demolition and remodelling of the roof to the existing dwelling. Alteration to the fenestration and material changes and elevational modifications to front and rear and side of the ground and first floors of the building. Such works shall also include the installation of a waste water treatment and percolation area to facilitate the new dwelling, the removal of the existing septic tank and the installation of a waste water treatment and percolation area unit to service the existing house.
The construction of two new dormer windows on the front southwest facing roof in place of 4 no. existing dormer windows, partial demolition of the ground and first floor, alterations to fenestration on all elevations, new roof windows on the rear northeast facing roof, internal alterations and all ancillary site works.
Permission for retention of a detached domestic use garage.
Permission to construct a dwelling house, to install a domestic waste water treatment system and to carry out all associated site works
Permission for the demolition of existing stables permitted under planning ref no 03/1694 and construction of new double garage in lieu there of and all other ancillary site works and also permission for retention of elevational changes to southern elevation of existing dwelling house permitted under planning reference number 93/1707
The brief summarizes the pattern across all 856 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19/4990The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.