Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 144 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Demolition of an existing cubicle house and construction of a new cubicle house with slatted tanks and all associated site works
1) Permission for decommissioning of the existing septic tank and installation of a new wastewater treatment unit and tertiary treatment system. 2) Permission for retention of the exiting site boundaries (change from boundaries shown on planning reference 11/4525). 3) Permission for construction of walls and pillars to complete the site entrance.
Retention of detached domestic garage/store, timber store and partial attic conversion to include 2no. rooflights to rear of existing dwelling house. Permission to construct a new single storey extension to rear and side of existing dwelling house.
A) construct a rear extension to existing dwellinghouse, b) entrance, waste water treatment system and all other site works
(a) Construct a two-storey dwelling house, (b) amend existing entrance and (c) install a septic tank and all associated site works.
Permission to (a) construct a new dwelling house, (b) modify an existing entrance and (c) install a new septic tank, percolation area and all associated site works
The brief summarizes the pattern across all 144 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19/5829The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief