Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 134 decisions within 5 km, 4 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a dormer dwellinghouse with carport and garage, entrance, septic tank percolation area and all associated site works
Retention of vehicular entrance as constructed on site and retention of detached domestic garage as constructed on site and all associated site works
Development on a c. 0.2 ha site, on ESB lands. The development will consist of a physical extension of c. 701 sq.m. to the existing electricity substation compound and will include: (a) site clearance works including removal of (1) existing 10 m high lattice steel end mast and associated overhead lines; (2) 2no MV poles and associated overhead lines; (3) existing busbars and electrical equipment; (4) existing entrance gates; (5) existing concrete post and wire fence (internal); (6) existing concrete plinths and cables; (7) existing lighting; and (8) demolition of existing single storey control building (c. 11.7 sq.m.); (b) provision of new electrical plant and equipment including: (1) a new 10 m high lattice steel end mast; (2) a new 12 m high MV pole; (3) partially walled house transformer compound on a concrete base (c. 7.4 sq.m., 1.3 m high); (4) new transformer (c. 3.5 m high) in existing bund; and temporary works for the duration of construction including palisade fencing and bunded transformer on concrete plinth (c. 29.7 sq. m., c. 3.5 m high); (c) three new modular structures on raised platforms including: MV module (c. 30.9 sq.m., 4.4 m high); control module (c. 30.9 sq. m., 4.3 m high); 38kV GIS Module (c. 28.1 sq.m., 4.8 m high); (d) site development works including provision of lighting; surfacing; internal access roads; new internal palisade fence – 2.6 m high; new external entrance palisade gate – 2.6 m high; provision of site services including drainage; and other ancillary works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.
Construct a dwelling, domestic garage and all associated site works and services.
A) Permission for retention of an existing slatted cubicle house as constructed (b) permission to construct an extension to existing cubicle house to include milking parlour, dairy, collection yard, slatted tanks, drafting area and loose house (c) construct a straw/hay shed and install a milk silo and roof water collection tank.
To construct a dwelling house, septic tank and percolation area, bored well, enlarge existing entrance and all associated site works.
The brief summarizes the pattern across all 134 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19/6396The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief