Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Under-Construction Martello Estate Ringacoltig, Ringmeen Rushbrooke. Cobh, Co. CorkOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Under-Construction Martello Estate Ringacoltig, Ringmeen Rushbrooke. Cobh, Co. Cork

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

10% of nearby decided applications were refused. The site check found 888 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.

Matched source
19/6705
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

2 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Register indexed

No structured appeal row is currently tied to the matched decision set.

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

888Nearby applications
2Site-linked candidates
10%Nearby refused
0Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

19/6705

The construction of 21 no. two-storey dwellings adjacent to the under - construction Martello Estate. The proposed development will consist of 3 no. 3 bed terraced units, 6 no. 3 bed semi-detached units, 10 no. 4 bed semi- detached units and 2 no. 4 bed detached units. Access to the proposed development will be via the under-construction junction from Norwood Grove and the under- construction internal road network permitted under register reference 17/6764. The proposed development will also include all associated drainage, site development and landscaping works. The proposed development is within the curtilage of Sacred Heart Convent and Lodge, Protected Structure (RPS Nos. 31,32,33 and 34).

Granted0.0 km09 June 2020
24/5722

Permission to construct a single storey rear extension and a two storey side extension to his dwellinghouse.

Granted0.1 km04 November 2024
17/6764

Demolition of an existing shed and the construction of a residential development comprising 56 no. semi-detached dwellings (46 no. two-storey dwellings, and 10 no. part two-storey/part three storey split level dwellings, of which 43no. are 3-bed (optional 2-bed) and 13no. are 4-bed). The proposed development will also consist of all associated site development works, drainage and landscaping, as well as a new access from the public road, on a site of c.2.314ha. The proposed development is within the curtilage of 4 Norwood Villas, a Protected Structure (RPS No.21) Knockeven House, a Protected Structure (RPS No. 28), and Sacred Heart Convent and Lodge, Protected Structure (RPS Nos. 31,32,33 and 34). The proposed development is a revision to a previously permitted 61 no. unit residential development, register reference PL.53.221918 (06/52038), as extended under register reference EXT/D/2012/4.

Granted0.1 km14 June 2018
25/5905

Permission to construct a new dwelling house and associated site works

Granted0.1 km06 November 2025
24/4300

Alter and extend existing two storey dwelling and carry out such works so as to subdivide the dwelling and change to two (2) semi detached, two storey houses as well as construction of four (4) detached two storey houses with 4 no. detached garages, with all associated site development works. Extension of Duration to Permission granted under Planning Ref. No.19/4992

Granted0.1 km17 April 2024
19/4992

Alter end extend existing two storey dwelling and carry out such works so as to subdivide the dwelling and change to two (2) semi detached, two storey houses as well as construction of four (4) detached two storey houses with 4 no. detached garages, with all associated site development works to include the sub-division of the lands into six separate plots each with own vehicular entrance and independent connection to public services

Granted0.1 km16 September 2019

The brief summarizes the pattern across all 888 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required