Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 603 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The importation of soil and stone for the raising of an agricultural field in order to improve the agricultural output of the field and the construction of a temporary new haul road. A Natura Impact Statement (NIS) has been prepared and submitted to the authority with this application.
3.43km of grid connection infrastructure on the public road to connect the approved Ballyspillane West Solar Farm (Planning Reference 175498) to the Midleton 110kV ESB Substation, comprising the laying of underground electricity cables and associated infrastructure and horizontal directional drilling. The proposed development will also include a customer substation which is proposed to relocate the substation consented within the associated solar farm development (PA Ref: 175498). The ESBN MV customer substation is to be located near the site entrance to the east, to align with the connection route to the national grid. Based on new ESB Networks design standards, two options have been considered for the design of the proposed substation. A Natura Impact Statement will be submitted to the Planning Authority with the application.
Installation of a cattle underpass, soiled water tank and associated works.
Construction of a calf house and associated works
Construction of dormer dwelling house and garage, including all associated site works
Construction of an animal house and associated works.
The brief summarizes the pattern across all 603 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19/6784The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief