Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 299 decisions within 5 km, 6 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for retention of changes to front elevation of dwelling and permission for extension to dwelling and the installation of a wastewater treatment system
For development of site
The construction of a single storey dwelling, garage, conventional septic tank and percolation area and associated site works
The partial demolition and alterations to existing elevations of dwelling, construction of a part two storey, part single storey extension to the side and rear of the existing dwelling, including the demolition of existing outhouses and reconstruction of same as garage/office/gym and all associated site works
The construction of a dwelling house and waste water treatment system, water bore well, alterations to existing site entrance, boundary treatments, and all associated landscaping and site works to site.
Construct a cubicle house with underground effluent storage tanks and associated site works.
The brief summarizes the pattern across all 299 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19/95The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief