Executive snapshot
10% of nearby decided applications were refused. The site check found 176 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a single storey extension to the north elevation of existing Club House and all associated site works
Permission is being sought for construction of a building for the storage and maintenance of fishing equipment and all associated site works
Planning permission for marine sourced feed & nutritional material processing and storage facility
Permission for a wastewater pump station at Derrymihin West TD. The proposed development would consist of the construction of a proposed underground wastewater pump station at Derrymihin West TD, adjacent to Castletownbere Community Hospital, which would form part of the proposed Castletownbere Sewerage Scheme, comprising an underground wastewater pump station, an underground emergency storage tank, valve and flowmeter chambers, manholes, pipework, regrading works, a new access road, a new access gate, post and rail perimeter fencing, a control kiosk, a vent stack and the decommissioning of an existing septic tank.
(1) Demolish existing workshop building, (2) Construct new workshop building with staff facilities, site boundary fence and vehicular entrances, (3) Install solar PV Panels on roof of proposed workshop building, (4) Construct internal access roadway and footpaths, (5) Construction of new waste storage shed, inclusive of all ancillary site works
The installation of LED street lighting; to include 36 lighting columns, 8m high with LED lamps
The brief summarizes the pattern across all 176 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20/161The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.