Applications tied to the site
Partial coverage15 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
15 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 189 decisions within 5 km, 15 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
15 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
15 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
(A). Permission for construction of a three storey extension to rear of the existing building, amended from previously granted planning ref 18/00524, (B) Permission for construction of a single storey extension to rear of building, (C) Permission for construction of service chute to rear of building, (D) Permission for alterations to elevations of existing building, (E) Permission for construction of 3 No. 18,000 litre underground static storage tanks, (F) Permission for construction of a detached plant room and associated 2 No. 15,500 litre over ground water storage tanks and all associated site development works
A) Permission for construction of single storey extension to side of existing building B) Permission for construction of extension to front of building incorporating design amendments of granted planning permission reference no. 17/00251 C) Permission for material alterations to elevations of existing building. And all associated site development works
Permission for (a) construction of three storey extension to rear of building, (b) construction of roof top plant area enclosure (c) construction of external escape stairway (d) alterations to elevations of existing building (e) construction of first floor and mezzanine level within the enclosure of existing building (f) construction of site boundary walls to southern and western boundaries of site and all associated site development works
The removal of an existing telecommunications pole with a dish on it and replacement with a new 18 metres monopole carrying antennas, a relocated dish, associated equipment, together with ground-based equipment cabinets and all associated site development works for wireless data and broadband services
Alterations and Extension to existing retail warehouse premises and associated site works
Construction of a two storey dwelling with septic tank, percolation area and associated site works
The brief summarizes the pattern across all 189 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20/239The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief