Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Lands to the east of the R630 in the townlands of Ballincarroonig and Aghada located inside the Aghada Generating Station, Ballincarroonig Whitegate, Co. CorkOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Lands to the east of the R630 in the townlands of Ballincarroonig and Aghada located inside the Aghada Generating Station, Ballincarroonig Whitegate, Co. Cork

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

10% of nearby decided applications were refused. The site check found 533 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.

Matched source
20/4294
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.

1 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Register indexed

No structured appeal row is currently tied to the matched decision set.

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

533Nearby applications
1Site-linked candidates
10%Nearby refused
0Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

20/4294

Development on a a c. 1.8 ha site, on ESB lands. The development will consist of a c.19 MW capacity battery storage facility located within a secured compound, and will - subject to detailed design, commercial and technical considerations, include: (a) a control building (c. 112 sq. m., c. 4.7 m high); (b) plant and equipment comprising: (1) up to 12 no. battery container units (c. 30 sq. m. and up to c. 4.7 m high) with roof mounted HVACs; (2) up to 6 no. battery unit transformers on concrete plinths (c. 11 sq. m. and c. 4 m high); (3) up to 6 no. inverter units (c. 30 sq. m. and c. 3 m high); (4) a bunded house transformer (c. 20 sq. m. and c. 3.3 m high) with firewall on three sides; (5) an MV stepdown transformer (c. 60 sq. m. and c. 4.5 m high) with firewall on three sides; (6) VAR supports system on a concrete plinth (c.24 sq. m. and c. 3.4 m high); (7) cable trays and associated service connections; (8) up to 4 no. lightning masts (c. 20 m high); (9) a c. 18 m high SCADA pole; (10) a pole mounted security camera (c. 8.3 m high); (c) c. 2.6 m high palisade fencing and gates; (d) demolition of an existing building (c. 147 sq. m. and c.5.5 m high) and (e) ancillary site clearance and development works including provision of areas of hardstanding, internal access roads, and connections to site services networks. The planning permission is being sought for a 10 year duration. A Natura Impact Statement will be submitted to the Planning Authority with the application. Licensed by the Environment Protection Agency under an Industrial Emissions (IE) License [Ref. P0561-05] and a Lower Tier COMAH site and therefore falls under the requirements of the Control of Major Accident Hazard (COMAH) Regulations, 2015.

Granted0.0 km09 April 2020
24/6510

Permission for the replacement of approximately 324m of existing 2.4m high chainlink fencing and associated gates with 324m of new 2.4m high green palisade security fencing/gates and all associated site works.

Granted0.1 km24 February 2025
18/6919

Alterations and improvements to the existing 220kV substation consisting of a single storey control building (approx 204 sqm and approx. 5.2 in height) located at the (rear) Southern corner of the existing substation; 11no. control and protection kiosks located adjacent to existing bays, each approx. 16 sqm and approx. 3.4m in height; 2no. lightning monopoles up to approx. 18m in height; a new wing coupler bay; new sectionaliser bay; new internal access road (approx. 5m carriageway width and 120m in length) running from the existing access road within Aghada electricity generating station along the South Western boundary of the substation; new perimeter vehicular gates at the Southern corner of the substation; associated modification to existing perimeter fence at the Southern corner of the substation, plus existing perimeter chain link fence to be replaced with new 2.6m high palisade fence, associated drainage to include foul holding tank, surface water soakpit, new watermain connection; and all associated site works. The development will also consist of alterations and improvements to the existing110 kV substation consisting of 1no. control and protection kiosk approx. 16sqm. and approx. 3.4m in height; 1no. lightening monopole up to approx 10m in height; upgrade of existing strung busbar to tubular busbar, extension of existing palisade fence around proposed lightening monopole and all associated site works. Extension of Duration of Permission granted under Planning Reference: 13/06071.

Granted0.1 km20 December 2018
18/5659

The development of a c.19 MW capacity battery storage facility located within a secured compound, on a 0.65 Ha site, and will –subject to detailed design, commercial and technical considerations; include; (a) up to 6 No. battery storage units [each typically comprising a containerised battery (c.12.2m x 2.5m x 3.2m), HVAC (c2.7m x 2.7m), inverter (c.3m x 3m) and transformer (c.3.3m x 3.3m)]; (b) a 28sq.m single storey control equipment building; (c) a 28 sq.m single storey switchgear building; (d) ancillary electrical plant including a transformer and var support unit; (e) a c.15.6m high lightning mast and c.18m high SCADA communications mast; (f) a 2.6m high chainlink fence and access gate, with primary access via the existing station and temporary access via the existing boundary onto the R630; (g) ancillary site works including site clearance and the installation of site services. Licenced by the Environmental Protection Agency under an Industrial Emissions (IE) Licence [Ref. P0561-05] and a Lower Tier COMAH site and therefore falls under the requirements of the Control of Major Accident Hazard Regulations (COMAH) Regulations, 2015.

Granted0.1 km20 August 2018
20/6011

Permission for development on a 1.81 ha site which is licenced by the Environmental Protection Agency under an Industrial Emissions (IE) Licence (Ref. P0561-05) and a Lower Tier COMAH site and therefore falls under the requirements of the control of Major Accident Hazard Regulations (COMAH) Regulations, 2015. The development will consist of a 75 MWe (electrical output) aero derivative gas fired turbine, including the following elements: (a) 1 No. turbine module (c.535 sq.m., c.15.2m high) in a fully enclosed weatherproof acoustic enclosure including a c.30m high stack, selective catalytic reduction (SCR), gas turbine and air intake; (b) supporting items of plant including: step up transformer with firewall (c.192 sq.m.); bunded station service transformer (c.11 sq.m); single storey control/electrical room (c.150 sq.m.); bunded ammonia storage tank (c.20 sq.m.); gas compressor (c.128sq.m.); gas compressor cooler (c.28 sq.m.); single storey building containing a fire suppression system and gas bottle storage (c.79 sq.m.); fin fan coolers (c.53 sq.m.); lube oil skid (c.32 sq.m.); fenced gas receiving station (c.11 sq.m.); (c) external service areas including a maintenance laydown area and an ammonia unloading area; (d) connections to existing site services networks including gas, liquid fuel, electrical, water and wastewater and an underground surface water attenuation tank connecting to surface water drains; (e) all other ancillary and miscellaneous site works including site clearance; site access and a temporary construction compound. [For information – the planning application represents a resubmission of a similar 55MW development approved by CCC under Reg. Ref. 19/05411]. The planning permission is being sought for a 10 year duration. The application relates to a development which comprises or is for the purposes of an activity requiring an Industrial Emissions Directive (IED) licence and full details of the proposed development and its anticipated environmental impacts will be notified to the Environmental Protection Agency (EPA). A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.

Granted0.2 km10 November 2020
19/5411

A 55 MWe (electrical output) aero derivative gas fired turbine, including the following elements: (a) 1 No. Turbine module (c.535 sq.m., c.15.2m high) in a fully enclosed weatherproof acoustic enclosure including a c.30m high stack, selective catalytic reduction (SCR), gas turbine and air intake; (b) supporting items of plant including: step up transformer with firewall (c.192 sq. m.); bunded station service transformer (c.11 sq. m.); single storey control/electrical room (c.150 sq. m.); bunded ammonia storage tank (c.20 sq. m.); gas compressor (c.128 sq. m); gas compressor cooler (c.28 sq. m.); single storey building containing a fire suppression system and gas bottle storage (c.79 sq. m.); fin fan coolers (c.53 sq. m.); lube oil skid (c.32 sq. m.); fenced gas receiving station (c.11 sq. m.); (c) external service areas including a maintenance laydown area and an ammonia unloading area; (d) connections to existing site services networks including: gas, liquid fuel, electrical, water, wastewater, and an underground surface water attenuation tank connecting to surface water drains; (e) all other ancillary and miscellaneous site works including site clearance; site access and a temporary construction compound. Planning permission is being sought for a duration of 10 years. The application relates to a development which comprises or is for the purposes of an activity requiring an Industrial Emissions Directive (IED) licence and full details of the proposed development and its anticipated environmental impacts will be notified to the Environmental Protection Agency (EPA). A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. A 1.81 ha site located to the east of the R630; located inside the Aghada Generating Station, which is licenced by the Environmental Protection Agency under an Industrial Emissions (IE) Licence [Ref.P0561-05] and a Lower Tier COMAH site and therefore falls under the requirements of the Control of Major Accident Hazard Regulations (COMAH) Regulations, 2015.

Granted0.2 km02 October 2019

The brief summarizes the pattern across all 533 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required