Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 237 decisions within 5 km, 10 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1)Construction of a warehouse to be used for storage purposes which will include a single loading dock, (2) construction of a revised vehicular entrance to suit articulated vehicles, (3) construction of a concrete wall with palisade railing around site perimeter,(4) construction of concrete pavements around new building and (5) all associated site works.
To construct i) Vehicle Testing Centre (CVRT) with all associated services & site works, parking & ii) signage.
Provision of a pedestrian footpath including public lighting, installation of rock armour/gabions and all associated services from entrance to Kanturk Castle (Paal East) along R579 to the junction fronting North Cork Co-op Stores (Dromalour).
A 5 MW solar farm comprising approximately 22,200 photovoltaic panels on ground mounted frames within a site area of 12.23 hectares, 2 no. single storey inverter/transformer stations, 1 no. single storey delivery station, security fencing, CCTV and all associated ancillary development works - Extension of Duration to Permission granted under Planning Ref. No. 16/4601
A 5 MW solar farm comprising approximately 22,200 photovoltaic panels on ground mounted frames within a site area of 12.23 hectares, 2 no. single storey inverter/transformer stations, 1 no. single storey delivery station, security fencing, CCTV and all associated ancillary development works. Extension of Duration to Permission granted under Planning Ref. No. 16/4601
The completion of the previously permitted solar farm development (planning ref no. 16/4601) with minor changes to the dimensions of the previously permitted photovoltaic panels and ground mounted array layout, 1 transformer station, 1 storage unit and 1 delivery station in addition to security fencing, CCTV and all associated ancillary development works within a site area of 12.23 hectares. All works will be completed with in the previously assessed site boundary under planning ref. no. 16/4601 at Dromalour, Coolclogh, Kanturk, Co.Cork. A Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the planning authority.
The brief summarizes the pattern across all 237 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20/4908The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief