Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 151 decisions within 5 km, 8 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a new dwelling house.
Alterations to the elevations of existing dwelling and for construction of single storey extensions to rear and side of dwelling and for demolition of agricultural shed and all associated site works including installation of new wastewater treatment unit and soil polishing filter.
To demolish part of dwelling house and to erect a bungalow type extension with attic development to remaining dwelling house also to decommission existing effluent treatment system and percolation area and install a new waste water treatment unit and polishing filter all within their site.
Dwelling house, detached domestic garage/store, waste water treatment system, entrance and bored well
Construction of a dwelling house, detached domestic garage/store, wastewater treatment system, entrance and bored well.
Construction of a dwelling and detached domestic garage and carrying out of all associated site works, including the installation of a septic tank and percolation area
The brief summarizes the pattern across all 151 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20/4970The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief