Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 189 decisions within 5 km, 4 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The importation of soil/stone for the raising of ground levels, construction of a shed for the storage of mobile homes for use in conjunction with Mobile Home business, hard standing area, vehicular entrance and all ancillary works.
Construction of a mobile home storage, sale and repair yard with the associated warehouse shed and prefabricated site office unit. Site works will include the raising of levels by the importation of granular fill and a small element of cut, with materials generated from the cut used within the development and for landscaping and boundary treatment. The proposal also includes a vehicular entrance off the Ballyhooly Road and all associated site, drainage, and development works.
To construct an 18m high telecommunications monopole support structure carrying antennas and transmission dish, with associated equipment units & security fencing.
The construction of 31 no. dwelling houses and all associated ancillary site development works including access onto Main Street and the Fermoy Road, parking, drainage, landscaping and amenity areas. Extension of Duration to Permission granted under Planning Ref. No. 19/5486.
The construction of 31 no. dwelling houses and all associated ancillary site development works including access onto Main Street and the Fermoy Road, parking, drainage, landscaping and amenity areas. Extension of Duration to Permission granted under Planning Ref. No. 19/5486
A 7-year planning permission for the construction of a temporary wastewater treatment plant to serve a residential development permitted under Cork County Planning Ref. 19/5486 and all associated ancillary site development works. The temporary wastewater treatment plant will replace 4 no. dwellings that were permitted under 19/5486.
The brief summarizes the pattern across all 189 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20/5222The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief