Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 80 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will consist of the construction of a wastewater treatment scheme for the village of Inchigeelagh. Permission is sought for the following components of the scheme; 1. Below ground pumping station (PS) with emergency storage capacity, control kiosk and boundary treatment, to be located on the north bank of the River Lee, just to the east of Inchigeelagh Bridge. 2. Wastewater treatment plant (WWTP) for a population equivalent of 292 people with associated and ancillary development works including tanks, kiosks, inlet works, hardstanding and boundary fencing. 3. Outfall pipe to convey treated effluent from the WWTP to the River Lee. 4. Access road from the R584 road to the WWTP site with boundary treatment. 5. Access road from the WWTP site to the PS site. 6. All associated ancillary site development works above and below ground.
Permission for the construction of 10 no. residential units (comprising a mix of 2 and 3 bed semi-detached and terraced units and all associated site works including a connection to the public sewer, modifications to an existing vehicular entrance and roadway, a new vehicular entrance, footpaths, parking, drainage, landscaping and public amenity areas
Permission for a) demolition of former garda station building, b) construction of dwelling house, c) construction of domestic garage, d) widening of existing entrance & e) all associated site works
Permission for construction of new detached building consisting of mainstream classroom, 2 no. SET rooms, office, storage, toilets and circulation area, proposed new boiler room, together with permission for the demolition of existing shelter and all other ancillary site works
Permission for the construction of a new detached building consisting of mainstream classroom, 2 no. SET rooms, office, storage, toilets and circulation area (with internal layout and elevational changes to that previously granted under planning reference number 24/4101, proposed new boiler room, together with permission for the demolition of existing shelter along with all other ancillary site works.
Alterations and extensions to existing school consisting of 2 no. SET rooms with circulation area, extension of existing toilets block on either side of the school building together with all other ancillary site works.
The brief summarizes the pattern across all 80 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20/5438The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief