Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 94 decisions within 5 km, 4 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a two-storey seafood processing facility including entrance the public road, wastewater treatment facilities, hard standing areas, parking facilities, and ancillary site works, plant pipework, tankage and equipment
Planning permission is sought for existing and proposed works at the existing seafood facility, as follows: Permission is sought for the retention and demolition of the existing: 1) Entrance Porch Extension, 2) Rear Lean-to extension, and 3) External Recreation Shelter. Permission is sought for the retention of the existing: 1) Dispatch extension, 2) Storage Shed, 3) Water Treatment House, 4) Fire Pump House, 5) ESB Sub-Station, 6) Bus Shelter, 7) 1st Floor Production Office, 8) 1st Floor Plant Rooms and associated external plant and platform. Permission is sought for the retention of the existing 2 no. Prefab Office Cabins with Temporary Permission sought for same for a period of 5 years pending construction of Amenity Extension. Permission is further sought for the construction of: 1) Two-storey administrative extension, 2) Western extensions to production area including cold storage, 3) Southeast Extension to Production Area, 4) Plant Platform Extension, 5) East Extensions to existing Production Area including new Maintenance Shed over existing Tanks, 6) Use of Site Entrance to cater for adjacent seafood premises in lieu of that proposed under Planning Ref. 15/195 & PL88.245373, 7) Installation of Wastewater Treatment System to replace existing and to include servicing adjacent seafood premises, 8) Alterations to Site Layout including provision of car, motorbike and bicycle parking, HGV manoeuvring areas, landscaping and all other associated ancillary site works
Permission for (1) retention of change of location and layout of boat shed to that granted under planning reference 00-1601 (2) change of use of boat shed to hobby room/artist's studio (3) change of layout of hobby room/artist's studio, and (4) closing up of the existing vehicular entrance at the east of the site and creation of new vehicular entrance onto the public road at the south of the site, and all associated siteworks
Permission for: (i) demolition of existing dwelling house, (ii) construction of replacement dwelling house, (iii) decommissioning of existing wastewater treatment system and replacement of same with new wastewater treatment system, and (iv) for all associated site works
Permission for retention and permission for completion of restoration of a ruined dwelling for use as a commercial dry store
Permission for (a) retention of portion of partly constructed timber framed store, (b) alteration to footprint of partly constructed timber framed store, (c) completion of timber framed store to include natural stone finish to elevations, (d) use of completed store for use as agricultural / tool store, (e) construction of entrance to public road for general and agricultural use, (f) alterations to roadside boundary to improve available sight distance and all associated siteworks
The brief summarizes the pattern across all 94 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20/545The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief