Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 137 decisions within 5 km, 4 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development on a c. 0.2 ha site, on ESB lands. The development will consist of a physical extension of c. 701 sq.m. to the existing electricity substation compound and will include: (a) site clearance works including removal of (1) existing 10 m high lattice steel end mast and associated overhead lines; (2) 2no MV poles and associated overhead lines; (3) existing busbars and electrical equipment; (4) existing entrance gates; (5) existing concrete post and wire fence (internal); (6) existing concrete plinths and cables; (7) existing lighting; and (8) demolition of existing single storey control building (c. 11.7 sq.m.); (b) provision of new electrical plant and equipment including: (1) a new 10 m high lattice steel end mast; (2) a new 12 m high MV pole; (3) partially walled house transformer compound on a concrete base (c. 7.4 sq.m., 1.3 m high); (4) new transformer (c. 3.5 m high) in existing bund; and temporary works for the duration of construction including palisade fencing and bunded transformer on concrete plinth (c. 29.7 sq. m., c. 3.5 m high); (c) three new modular structures on raised platforms including: MV module (c. 30.9 sq.m., 4.4 m high); control module (c. 30.9 sq. m., 4.3 m high); 38kV GIS Module (c. 28.1 sq.m., 4.8 m high); (d) site development works including provision of lighting; surfacing; internal access roads; new internal palisade fence – 2.6 m high; new external entrance palisade gate – 2.6 m high; provision of site services including drainage; and other ancillary works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.
To construct a dwelling house, septic tank and percolation area, bored well, enlarge existing entrance and all associated site works.
Permission to construct a dwelling house, septic tank and percolation area, bored well, enlarge existing entrance and all associated site works. Extension of Duration to Permission granted under Planning Ref. No. 21/5243
Retention of vehicular entrance as constructed on site and retention of detached domestic garage as constructed on site and all associated site works
Construct a dwelling, domestic garage and all associated site works and services.
To construct a dormer dwellinghouse with carport and garage, entrance, septic tank percolation area and all associated site works
The brief summarizes the pattern across all 137 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20/5467The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.