Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 112 decisions within 5 km, 5 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To demolish existing extension to existing cottage, demolition of existing shed on site, to construct new extension to include first floor living space and alterations to existing cottage and new vehicular entrance and all associated site works.
Construction of a detached, single-storey, 4-bed, dwelling house and associated wastewater treatment system, which includes a packaged wastewater treatment system & polishing filter, as well as all associated site works.
Construction of an extension to existing dwelling house for use as a separate dwelling unit.
Construct a dwelling house and garage with related site works.
To modify the existing entrance and to construct a new access road to a forestry block and all associated site services.
(a) Retention of cubicle shed (b) Demolition of derelict buildings (c) Construction of an extension and partially re-roof existing cubicle sheds (d) Construction of underground slatted slurry storage tank (e) Construction of extension to existing straw bedded shed (f) Construction of 2 no. silage pits (g) Construction of a machinery shed (h) Demolition of existing entrance and construction of a new entrance in its place and all associated siteworks.
The brief summarizes the pattern across all 112 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20/5538The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief