Executive snapshot
9% of nearby decided applications were refused. The site check found 524 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will consist of: development on a 0.8ha site of a c. 2MW capacity edge computing facility located within a secured compound, and will, subject to a detailed design, commercial and technical considerations, include: (a) 1 no. modular control building (c. 116sq.m. and c.4.1m high). (b) Electrical and computing plant and equipment comprising: (1) 20 No. IT modules (c. 45 sq.m. and c. 3.9 sq.m high with additional roof mounted cooling units), (2) 2 No. LV modules (c. 59 sq.m. and c. 3.8m high), (3) 2 No. battery modules (c.25 sq.m and c. 3.8m high), (4) 1 No. MV module containing bunded and ventilated transformer (c. 29.7 sq.m. and c. 3.8m high) and (5) 7 no. standby generator units (c. 10 sq. m. c. 2.3m high), surrounded by c. 2.6 m high palisade fencing and gates (d) Ancillary site clearance and development works including provision of areas of hard standing, car park area, covered walkway linking all modules and connections to site services networks. Licenced by the Environmental Protection Agency under an Industrial Emissions (IE) Licence [Ref. P0561-05] and a Lower Tier (COMAH) site and therefore falls under the requirements of the Control of Major Accident Hazard Regulations (COMAH) Regulations, 2015
A c.159 MW capacity battery storage facility located within a secured compound, on a c. 3.2 Ha site, and will - subject to detailed design, commercial and technical considerations, include: (a) up to 89 No. battery container units (c.14.7 m x 3.4 m x 3.8 m); (b) up to 36 No. inverter units (c.12.2 m x 2.4 m x 2.9 m); (c) a substation compound surrounded by a 2.6 m high palisade fence with a dedicated access gate containing a single – storey control building (c. 240 sq.m.) and electrical plant including a bunded transformer (c. 200 sq.m. with a c. 8m high fire wall on one side); a bunded house transformer (c. 20 sq.m. surrounded on 3 sides by a c. 3 m high fire wall) and var support unit (4 m x 3 m x 3.4 m high); (d) a single storey battery control building (c. 156 sq.m.); (e) a 2.6 m high palisade fence and access gate, with primary access via the existing station and internal roadway network and temporary access via the existing boundary onto the R630; (f) ancillary structures including lightning masts (c. 18 m high) and pole mounted CCTV cameras (c. 8.3 m high); (g) and ancillary site works including site clearance works and the installation of site services including underground cables. The planning permission is being sought for a 10 year duration. A Natura Impact Statement will be submitted to the Planning Authority with the application. Licensed by the Environmental Protection Agency under an Industrial Emissions (IE) License [Ref. P0561-05] and a Lower Tier COMAH site and therefore falls under the requirements of the Control of Major Accident Hazard Regulations (COMAH) Regulations, 2015.
Minor modifications and reconfigurations to the previously permitted Battery Energy Storage System (BESS) development (Cork County Council Reg Ref. 19/04891), primarily comprising: (1) Updated layout of the substation compound based on revised electrical requirements to facilitate grid connection; (2) revised battery equipment based on updated battery technology; and (3) ancillary equipment to support the BESS development. The amended design incorporates: a 159 MW capacity BESS facility located within a secured compound, on a c. 3.3 Ha site, and will include: (a) 36 No. battery container unit arrangements on concrete plinths (95 sq.m.; height of 3m); (b) 36 No. inverter / transformer / RMU unit arrangements on concrete plinths (50 sq.m.; height of 4.2m); (c) a substation compound surrounded by a 2.6 m high palisade fence with a dedicated access gate containing: 2 No. control building (c. 240 sq.m. 5.1m high ) and electrical plant including: 2 No. bunded house transformers (c. 200 sq.m. surrounded by 8m high fire wall); 2 No. bunded house transformers (c. 19.8 sq.m. surrounded by 3 m high fire wall) and 2 No. VAR support units on concrete plinths (24 sq.m., 3.4 m high); (d) a 2.6 m high palisade fence and access gate, with primary access via the existing station and internal roadway network and temporary access via the existing boundary onto the R630; (e) ancillary plant equipment and structures including lightning masts (c. 18 m high) and pole mounted CCTV cameras (c. 8.3 m high) and ancillary site works including site clearance works and the installation of site services including underground cables. The planning permission is being sought for a 10 year duration. Licensed by the Environmental Protection Agency under an Industrial Emissions (IE) License [Ref. P0561-05] and a Lower Tier COMAH site and therefore falls under the requirements of the Control of Major Accident Hazard Regulations (COMAH) Regulations, 2015.
Permission for retention of following; garden/ utility shed to rear of existing dwelling, raising height of boundary wall behind backline of existing dwelling, provision of covered walkway using perspex sheeting down side of existing dwelling
Retention and completion of a garage adjacent to existing dwellinghouse for purposes ancillary to the enjoyment of the dwelling, and all associated site work.
Two storey rear extension attached to dwelling house and a lean too roof attached to side of dwelling house.
The brief summarizes the pattern across all 524 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20/5788The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief