Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 96 decisions within 5 km, 5 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of 2 no. dwellinghouses, entrance and all associated site works.
Permission for a residential development comprising of the construction of 6 no. residential units. The residential mix is as follows: 4 no. 2 bedroom town houses and 2 no. 3 bedroom town houses. The proposed development will also include associated site development works including vehicular access, car parking, footpaths, foul and storm drainage networks, water-mains, bin storage, public lighting and boundary wall. This application is accompanied by a Natura Impact Statement (NIS).
Permission for upgrade works at the Freemount Water Treatment Plant (WTP). The development will consist of the following: Coagulation, Flocculation and Clarification: Upgrade of poly aluminium chloride (PACI) chemical delivery area, with concrete road sloped to a new drainage gully and dedicated spill tank to contain any potential chemical spills during the delivery process. Disinfection: Install an outdoor bunded chlorine bulk storage tank with a capacity of 2m3 equipped with chemical dosing cabinet. New emergency shower and chemical delivery area for spill containment, new drainage gully connected to dedicated underground spill tank. WTP Residuals: Decommissioning of the existing residual tanks. Refurbishment of the existing used wash water equalization tank (UWWET), including installation of 1 No. mixer and pump replacement. New backwash pump kiosk housing the new backwash pumps and upgraded residuals treatment MCC panel. Installation of 1 No. new 119m3 sludge settlement tank. Installation of a UWWET pumping station. Installation of 1 No. new 16m3 sludge balance tank including for recirculation pumps. Installation of sludge balancing pumping station. Installation of 1 No. new 24m3 picket fence thickener. Installation of a sludge holding tank feed pumping station. Installation of 1 No. new 82m3 sludge holding tank with facility for off-site tankering connection. Ancillary Works: Installation of manholes, access chambers, instrumentation, monitoring equipment & controls in accordance with Uisce Eireann’s technical standards. General groundworks, surfacing, landscaping, ducting, drainage and pipe work associated with the proposed works described above. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.
Retain as constructed extension to dwellinghouse, car garage and domestic store all for private use
Permission to construct (i) milking parlour building with dairy, plant, slatted tank, flow channel & collecting yard, (ii) cubicles shed extensions with slatted tanks and calving areas, (iii) calf shed and all associated site works. Retention permission for a straw and machinery storage shed. Demolition of existing (i) milking parlour, (ii) storage shed is also required
Construction of dwelling, domestic garage, installation of wastewater treatment system and polishing filter and associated site works
The brief summarizes the pattern across all 96 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20/5966The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief