Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 644 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The implementation of a landscaping scheme to provide for the screening and landscaping of the northern boundary of the site using existing overburden materials, within an application area of 3.55 hectares.
Permission for retention of the two-storey rear extension to existing dwellinghouse, 2 no. domestic garages as constructed & the vehicular entrance as constructed and all associated site works.
Permission to (A) Decommission existing septic tank and percolation area serving existing dwelling and (B) install a new septic tank and percolation area.
The demolition of 3 no. structures consisting of 2 no. uninhabitable dwellings (50m.sq. and 150m.sq.) and an associated outbuilding (400m.sq.) within an application area of 0.4 hectares.
Permission to construct a new dwelling house.
The development is similar to that previously granted under An Bord Pleanala reference number PL04.QD.0010 and will consist of the deepening of the existing quarry extraction area by 2 no. 15 metre benches from -20m OD to -50m OD, along with minor amendments to the permitted quarry layout (plan file ref. no’s: S/02/5476 and ABP Ref. PL04.203762 and ABP Ref. PL04.QD.0010) all within the existing permitted quarry footprint and the continued use of the existing water management system ( settlement pond / infiltration pond system, permitted under PL04.QD.0010) for the life of the proposed development, all within an application area of c. 12.6 hectares. An extraction capacity of up to 375,000 tonnes per annum is sought to provide the applicant with the ability to respond to demand for aggregates for large infrastructure projects in the region. Permission is sought for twenty years plus two years for final restoration (total duration 22 years). The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR).
The brief summarizes the pattern across all 644 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20/6709The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief