Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 427 decisions within 5 km, 5 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a two storey office development (with pedestrian link bridge) extension to the side and rear of the Paddy O’Keeffe Innovation Centre and also undertake remodelling and expansion of the existing carpark and road network. All the above works to be inclusive of associated ancillary accommodation and site works.
Permission for: a) Demolition of our existing single storey grasslands laboratory unit and adjoining agricultural buildings, b) Construction of a new two storey laboratory building with single storey office and storage facility, c) Construction of a new agricultural animal nutrition building, d) Construction of a new ESB substation, e) Undertake all associated ancillary accommodation and site works and construction of new carpark on our site.
The construction of a milking equipment farm storage building, inclusive of all necessary associated ancillary accommodation and site works.
Construction of a new Weanling/Young Stock Unit and all associated site works.
Permission for construction of a modular calf agricultural building and all associated site works on our site
Permission for alterations to an existing building unit consisting of the installation of photovoltaic panels on the existing roof structure, together with all associated site works.
The brief summarizes the pattern across all 427 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20/6904The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.