Applications tied to the site
Partial coverage15 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
15 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 189 decisions within 5 km, 15 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
15 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
15 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
Permission to 1. Demolish existing dwellinghouse, 2. Demolish associated farm buildings, 3. Construct 5 no. dwellinghouses and all associated site works
Permission for the construction of holiday accommodation for short-term letting, a new pedestrian / cyclist access onto Sailor's Lane, a bike store, bin store, a wastewater collection tank and pump station and all associated car parking, landscaping and site development works. The proposed holiday accommodation will consist of: (1) the construction of 6 no. glamping pods and (2) the refurbishment, extension and change of use of an existing agricultural building to an activity building ancillary to the holiday use.
Change of use of part of domestic outbuilding to commercial use to consist of entrance at ground level, kitchen / processing area at first floor level and drying area at loft / mezzanine level. Permission also sought for alterations to elevations including velux rooflights, dormer over doorway and footbridge linking from first floor to existing stone steps
Permission for: (i) retention of change of use of former service station to restaurant, (ii) permission for construction of new extension to restaurant and (iii) associated site works
Erection of a single storey extension to dwelling house and associated site development works
Erection of domestic garage / shed and associated site development works
The brief summarizes the pattern across all 189 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 21/2The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief