Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 513 decisions within 5 km, 5 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A 10 year planning permission for a solar farm consisting of up to 220,100 m2 of solar panels on ground mounted frames, 13 no. single storey electrical inverter/transformer stations and associated spare equipment container, battery storage container, customer switchgear container, security fencing, satellite communications pole, CCTV, access tracks, upgrades to two existing agricultural field entrances, temporary construction compounds, landscaping and all associated ancillary development works. Construction and operational access will be via the L-7694. The project will connect with and represents an extension to the adjacent solar farm permitted under Planning References 18/6769, 19/5729 and 19/6882. The solar farm will connect to the national grid and will have an operational lifespan of 35 years.
Permission to a) renovate & extend existing domestic garage, b) change of use from a domestic garage to a detached granny flat and c) all ancillary site works
A 10 year planning permission for a solar farm consisting of up to 172,000 m2 of solar panels on ground mounted frames, 9 no. single storey electrical inverter/transformer stations, storage unit, security fencing, satellite pole, CCTV, landscaping and all associated ancillary development works. Construction and operational access will be via existing field entrance from the L-36172. The project will connect with and represents an extension to the adjacent solar farm permitted under planning references 18/6769 and 19/05729. The operational lifespan of the solar farm will be 35 years.
Permission for a 10 year planning permission for the proposed development of an underground electricity interconnector cable will comprise of a 33kV double circuit underground cable route, of c.4.3km in length which is to be installed in an excavated trench including underground ducting, joint bays, horizontal directional drills (HDD), communication chambers and all associated site development and reinstatement works. The interconnector cable will extend from two newly proposed ring main units at the permitted Ballynaclashy Solar Farm to a substation at the permitted Lysaghtstown Solar Farm. The proposed development provides for a revision to part of the approved layout of the Ballynaclashy Solar Farm previously permitted under Cork County Council Planning Reference 21/4050 / An Bord Pleanála Reference ABP 311238-21. The revision to the layout comprises the installation of 2 no. ring main units and the laying of the underground electricity interconnector cable. The proposed development also provides for a revision to part of the approved layout of Lysaghtstown Solar Farm as previously permitted under Cork County Council Planning Reference 18/6769 (as amended by references 20/6891 and 21/5089). The revision to this layout comprises the laying of the underground electricity interconnector cable to a substation permitted under An Bord Pleanála Reference ABP 308979-20. The development will be carried out within a combination of the above referenced permitted solar farm boundaries, on private lands and within the L-7634, L-36172, L-7694 and R626 public roads. The underground electricity interconnector cable will be routed around Tomasheen Bridge through private lands via HDD. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.
Construction of a part single storey, part two storey dwelling and associated single storey domestic garage, with a new wastewater treatment unit and percolation area, including all associated site works and associated landscaping.
Construction of a silage slab, concrete apron and an animal house incorporating slatted tank, feed passage and associated works.
The brief summarizes the pattern across all 513 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21/4050The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief