Executive snapshot
13% of nearby decided applications were refused. The site check found 289 decisions within 5 km, 5 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a new dwelling house.
Existing west, south and north elevations of the existing commercial building including the alterations with all associated site and ancillary works.
Construction of a two storey 60 bed nursing home and 20 no. assisted living dwellings, new access and footpath to Station Road, associated parking and roadways with all associated landscaping and ancillary services - Extension of Duration to Permission granted under Planning Ref. No. 09/8056 and An Bord Pleanála Ref. No. PL 04.238353.
Permission for; a) development of commercial storage facility, consisting of a first floor internal extension over existing ground floor with new external fire escape stairs at the rear, b) change of use of existing refrigeration/workshop/office building to a self-storage facility; c) elevational changes and internal alterations to existing building, d) upgrading of site entrance, e) provision of signage, f) permission to decommission the existing septic tank and all associated site works
(1) A new portal frame modular assembly workshop extension, storage annex with upper mezzanine, adjoining substation & distribution room, 50msq of PV solar panels and signage. (2) New portal frame storage warehouse, entrance, paved yard signage. (3) High bay height extension to existing Vessel manufacturing workshop, signage and all ancillary site works,
The construction of 1 no. new hardstanding storage area and 28 no. open storage bays for the storage of construction materials and equipment. 2) New primary vehicular access point including access gate, along with new secondary vehicular access point (including automatic barrier) from the internal roadway permitted under Pl.Reg.No. 22/6257. 3) Minor amendments to the road/footpath layout and car parking from that permitted under Pl.Reg.No. 22/6257. 4) Minor amendments to the landscaping from that permitted under Pl.Reg.No. 22/6257, including new planting at the west and north of the proposed storage yard, new green area at the south of same, new swale at the east of same, along with new green area at the east of the building. 5) Amendments to surface water network from that permitted under Pl.Reg.No. 22/6257. 6) All ancillary development including boundary treatments, public lighting, services and infrastructure, works to the adjacent public road and footpath and undergrounding of existing 38kV ESB electrical cables.
The brief summarizes the pattern across all 289 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21/4310The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.