Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 436 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(a) construct a new all-weather synthetic grassed playing pitch, (b) erect floodlighting around the perimeter of the proposed playing pitch, (c) erect new perimeter fence around the proposed playing pitch and associated site works.
Retain existing rear extension and to construct a new side and front extension with new rear roof windows to existing dwelling and all associated site works.
To erect on a temporary basis (for a maximum period of five years) six classrooms, in two prefabricated single-storey buildings detached from the main school building, together with all associated site works.
The development of 2 no. extensions to the existing school, comprising of a 2-storey, 6 classroom block with ancillary teaching rooms of 1810m2 in area, to the north end of the existing school; and a new single storey Special Needs Unit of 600m2 in area, comprising teaching and ancillary rooms to the south end of the existing school, with additional car parking spaces provided on the site, and associated ancillary hard and soft landscaping works.
Erection of 2.4m high metal palisade fences with gates between the existing clubhouse and the south-western and north-eastern site boundaries, 1.2m high green pvc coated wire mesh fence behind the front (south-eastern) boundary wall (with a 1.2m high pedestrian gate at the east end of the front boundary) and on the south-western return boundary in front of the club house, a 2.4m high metal palisade fence to the side (south-western, behind the clubhouse) and rear (north-western) boundaries of the club property, together with all associated site works
Extension of duration of Residential development for construction of 66 no. residential units with all ancillary site development works. Development to include the construction of 66 dwellings consisting of 8 no. 3 bedroom semi-detached units, 8 no. 4 bedroom semi-detached units, 12 no. 2 bedroom end of terrace units, 9 no. 2 bedroom mid-terrace units, 13 no 3 bedroom end of terraced units, 12 no. 3 bedroom mid-terrace units, 3 no. 4 bedroom end of terrace units, 1 no 4 bedroom mid-terrace unit, construction 3 no. entrances, installation of waste water pumping station, installation of ESB sub-station kiosk, and all associated site development works to include local play areas, open space areas, roadways, footpaths and services with development connection to existing services. Granted under Planning Reference Number 18/4041.
The brief summarizes the pattern across all 436 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21/4355The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief