Applications tied to the site
Partial coverage83 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
83 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 340 decisions within 5 km, 83 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
83 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
83 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for retention of 2 no. external retractable awnings to the north-west elevation of the 'Box of Frogs' cafe'
Permission for the following works to existing bar: (i) single storey extension to the rear, consisting of a commercial kitchen and (ii) associated site works including adjustment to rear boundary wall with laneway and installation of new doorway and (iii) change of use of Bar to Bar/Restaurant
Permission for the following changes to existing building: (i) retention of change of use of ground floor unit from offices to retail use and coffee shop, (ii) permission for change of use of upper 3 floors of building from offices to Bed and Breakfast (currently in use for the housing of Ukrainian refugees, exempt development under European Union (Planning and Development) (Displaced Persons from Ukraine Temporary Protection) Regulations 2022), and (iii) retention of projecting sign to front elevation
Permission for the following works to existing town building which consists of a bar to the ground floor and apartment to upper floors: (i) retention of demolition of rear first floor w.c. annex, (ii) permission for fenestration and elevational changes to front elevation and (iii) permission for fenestration changes to rear elevation
Permission for the extension and refurbishment of existing dwelling house to provide two apartments including: (i) demolition of existing sunroom extension to rear, (ii) construction of new two storey extension to rear, (iii) fenestration changes to the rear including installation of external door and 3no. rooflights, and (iv) all associated site works.
Permission for the redevelopment of an existing three storey commercial/residential premises, incorporating The Anchor Tavern, the former Paper Shop and adjoining buildings, which includes the following works: (i) part-demolition of rear annexes and construction of new extension to rear, (ii) change of use and layout to provide restaurant/café, retail unit and public house to ground floor and 7 no. apartments to the upper two floors, (iii) installation of service access building to top of existing flat roof, (iv) minor fenestration and door changes to both New Street and William Street elevations, (v) installation of new shopfront signage, and (vi) all associated site works. The development includes works to Protected Structures (RPS IDs: 00918 and 00977)
The brief summarizes the pattern across all 340 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21/443The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief