Applications tied to the site
Partial coverage9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 99 decisions within 5 km, 9 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a dwelling house, detached domestic garage, new domestic entrance off the public road, wastewater treatment system and percolation area and all ancillary site works and services.
Erect a single storey dwelling house, on site waste water treatment system and all associated site works.
Demolition of existing detached cottage; construction of a new part two storey/ part single storey detached dwelling; construction of storage shed & car port; a proposed waste-water treatment unit and associated percolation area; a new vehicular entrance & all associated site development works.
Construction of 4 no. accommodation pods for short term letting to the rear of the existing dwelling house and installation of new on site waste water treatment system and all associated site works
The construction of four no. accommodation pods for short term letting to the rear of the existing dwelling house and installation of new on site waste water treatment system and all associated site works.
Permission to construct a new dwelling house, new vehicular entrance, domestic garage, install a waste water treatment system & percolation are and all associated site works
The brief summarizes the pattern across all 99 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21/4583The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief