Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 135 decisions within 5 km, 3 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To demolish existing extension to existing dwelling, construction of new extension to existing dwelling and permission for retention of front porch to existing dwelling
Construction of dwelling, domestic garage, site entrance, effluent treatment system, including all associated site development works.
To erect a dwellinghouse, detached domestic garage, entrance and all associated site works including wastewater treatment system and soil polishing filter.
To construct a dwelling and all associated site works.
Retention of two storey dwelling house as constructed on site, Permission for upgrade of septic tank system and percolation area serving existing dwelling house with new wastewater treatment system and polishing filter to ensure compliance with EPA Code of Practice 2009 standards and all ancillary works.
To construct a slatted cubicle shed and retention for (A) calf house (B) slatted shed (C) feed passage and (D) extension to cubicle house feed passage.
The brief summarizes the pattern across all 135 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21/4797The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief