Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 305 decisions within 5 km, 8 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for change of use from existing day facilities / short stay respite residential accommodation to include both long term or short term residential accommodation and associated day facilities, minor alterations and associated site works
Alterations to façade of doctors surgery including relocating door and window to provide wheelchair accessible door and cut-out lettering signage
Installation of a floodlighting system consisting of 6 no. 18.5m high light standards and associated site works incorporating concrete bases, ducting, chambers and housing for generator, also permission for raising of pitch levels with imported topsoil
Permission to demolish two existing temporary classrooms and to construct a series of extensions to the front and rear of the existing school to form a new ASD classroom, resource room, storage room, WC's and all associated external works and servicing and landscaping
Development of the former St. Fachtna's De La Salle secondary school consisting of: a) Permission for retention of change of use of prefab classroom buildings to office use, b) permission for change of use of the main former school building to commercial office use including alterations to elevations, provision of car parking and all associated site development works, c) permission for retention of alterations to roof including installation of solar panels
Construction of a detached store and alterations to the facade
The brief summarizes the pattern across all 305 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21/499The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief