Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,133 decisions within 5 km, 8 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A single storey extension to the rear and to the side of the existing dwelling, and all associated site work.
Permission for 1 no. Dormer Bungalow.
Construction of a residential development of 96 no. dwelling houses, single storey crèche and all associated ancillary development works. The proposed development will be constructed in 3 phases and include 9 no. 4 bedroom detached dwelling houses, 14 no. 4 bedroom semi-detached dwelling houses, 64 no. 3 bedroom semi-detected dwelling houses, 7 no. 3 bedroom townhouses and 2 no. 4 bedroom dormer dwelling houses. Access will be provided via 2 no. entrance from the Coolmore Gardens and potential link to the proposed L6472 Shanbally to Raheen link road (part of the M28 Cork to Ringaskiddy Motorway Scheme [An Bord Pleanála Reference: PL04.HC0001])
1. Construction of ground floor extension (kitchen/playroom) at the rear of existing dwelling. 2. Conversion of existing original garage to dining room. 3. Construction of garage/storage shed at the side of existing dwelling. 4. Metal garden shed and timber outhouse for storage at the rear of existing dwelling and all associated site works.
The demolition of existing derelict cottage and the construction of a residential development of 23 no. units comprising 1 no. 4-bed detached unit, 1 no. 5-bed detached unit, 4 no. 3-bed semi-detached units, 16 no. 4-bed semi-detached units, 1 no. 4-bed storey and a half detached unit, 46 no. car parking spaces, 1 no. new dedicated vehicular entrance, 1 no. new dedicated pedestrian entrance, and all other road, drainage and associated site development works.
A new dormer bungalow, domestic garage and new vehicular entrance and associated site works and to demolish existing shed.
The brief summarizes the pattern across all 1,133 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21/5078The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief