Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 243 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a new dwelling house.
To construct a new dwelling house.
Permission for 1) the demolition and removal of the existing roadside walls, piers and entrance gates and the construction of a new low level entrance, gates, and wing walls to create necessary setback and sightlines, 2) the construction of a new dwelling house and garage, 3) provision of auxiliary boundary landscaping, driveway, bored well and all other necessary ancillary site development works
Permission for:- 1) Construction of a single storey dwelling house for the applicant's own use. 2) Permission for retention of mobile home and septic tank and removal of same on completion of the proposed dwelling. 3) Construction of a garage. 4) Construction of a stables to house the applicant's domestic ponies, 5) The removal of old sheds on completion of stables and 6) The retention of the existing gates, pillars and entrance at their current location and Permission to alter roadside boundary wall to facilitate sightlines and all other ancillary site development works.
An extension to an existing dwelling, changes to the façade of the existing dwelling, a new driveway to an existing site entrance and all associated site works.
The construction of a part single storey part 2 storey dwelling house with detached garage, new bridged site entrance to existing public road, installation of a packaged waste water treatment system, landscaping, and all ancillary site development works.
The brief summarizes the pattern across all 243 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21/5166The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief