Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 289 decisions within 5 km, 7 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a residential development of 56 no. units which will consist of the following: - 12 no. 3-bed semi-detached, 14 no. 3-bed end-terrace, 5 no. 3-bed mid-terrace and 9no. 2-bed mid terrace 2-storey dwelling houses along with 16 no. 1-bed maisonettes. Access to the proposed development is to be provided via the existing road serving the adjoining Brindle Hill residential development. Planning permission is also sought for connection to all necessary public services, secure bicycle parking and bin storage, associated landscaping and all ancillary works necessary to facilitate the development.
The construction of a residential development of 56 no. units which will consist of the following: - 12 no. 3-bed semi-detached, 14 no. 3-bed end-terrace, 5 no. 3-bed mid-terrace and 9no. 2-bed mid terrace 2-storey dwelling houses along with 16 no. 1-bed maisonettes. Access to the proposed development is to be provided via the existing road serving the adjoining Brindle Hill residential development. Planning permission is also sought for connection to all necessary public services, secure bicycle parking and bin storage, associated landscaping and all ancillary works necessary to facilitate the development.
Construct a new single storey extension to rear of existing dwelling.
Demolish existing dwelling and construct a new dwelling house and all associated site works
Development consisting of rooftop solar PV installation on the existing roof of service station. The development will consist of a solar PV array totaling 276.82sqm and all associated site works and ancillary works.
Retention for; 1) Minor alterations to elevations, internal modifications to layout and minor increase to footprint of extension to petrol station / shop / diner permitted under Planning Reg. No. 01/1502, 2) Retention for change of use of store permitted under Planning Reg. No. 05/4350 and extension to same for use as dry goods store, food preparation area, bakery, kitchen, cold rooms, staff amenities and attached waste store and enclosed yard area (partially covered by canopy), 3) Retention for change of use and alterations to elevations / layout, including new roof, of dwelling house on site to use as solid fuel store, ancillary to petrol station, partial demolition of boundary wall to said dwelling and closure of site entrance to Charter School Road previously serving dwelling, 4) Retention for alterations to site entrance on Charter School Road and 3no. site entrances on N20, 5) Retention of forecourt canopy, 6) Retention for signage on side elevation of shop, 7) Retention for brush car wash, associated store and 2no. manual car wash units, 8) Retention for car parking layout as constructed including 67no. car parking spaces and 2no. HGV spaces, 9) Retention for self-service laundrette unit and, 10) all associated site works.
The brief summarizes the pattern across all 289 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21/5518The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief