Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 143 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for retention for alterations and conversion of the existing lean-to shed for use as an extension to stable block (planning reference number: 99/4397) and permission for change of use of stable block, including the extension to stable to a dog grooming parlour, training area, reception, staff room, isolation kennel and storage areas and permission to construct a dog kennel block and external dog run areas and all associated ancillary site and landscaping works.
Permission for the retention of existing detached domestic garage
Permission for the restoration, partial demolition, alterations and the construction of extensions to the west and north of the existing house, along with construction of a new wastewater treatment system, new entrance and access driveway and all associated site works
To 1) construct a dormer extension to the front south elevation 2) construct a single storey flat roofed extension to the side east elevation with alterations to the remaining elevations to the dwelling house 3) to install a secondary waste water treatment system with polishing filter 4) decommission the existing septic tank on site and 5) retention of the existing entrance all at the property.
To construct dwelling, septic tank, bored well and all associated site works.
Construction of a loose house, slatted house with slurry tank, two overhangs and silage slab and demolition of existing loose house, cubicle house and silage pit and associated works.
The brief summarizes the pattern across all 143 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21/5713The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief