Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 130 decisions within 5 km, 3 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(A) The demolition of an existing dwelling house, (B) the decommissioning of existing septic tank (C) the construction of a new two storey dwelling house and adjacent new domestic garage (D) the installation of a new wastewater treatment system and percolation area, along with all associated site works.
Permission to construct a new dwelling house (change of design from that granted under ref no. 21/6609)
(i) Demolish an existing building and remove associated fuel and oil tanks (ii) Erect a new garage building for the repair of motor vehicles along with use of same for depollution and dismantling of end of life vehicles and use of the building for storage of vehicles and parts and (iii) Storage of end of life vehicles and parts in external yard areas (iv) Decommissioning of existing septic tank and permission to install a new wastewater treatment system and ancillary sit works. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application.
Erect a 24m high lattice telecommunications support structure together with associated telecommunications equipment all enclosed in security fencing and to extend the existing access track.
Construction of an animal and agricultural vehicle river crossing and all associated site works. A Natura Impact Statement will be submitted with the application.
(1)Construction of new inlet works, new storm overflow and flow splitting chamber, new aeration tanks, new settlement tanks, and cloth filter structure, new storm tank, new sludge drying reed beds, new outfall pipeline together with associated tanks, chambers, pipelines, provisions of new admin and welfare modular kiosk, upgrade to boundary treatment to include 2.4m high weld mesh fence, new internal access road, public lighting and all associated site development works (2) Construction of new admin/welfare modular building. (3) decommissioning of the existing wastewater treatment plant, equipment and associated structures as part of the upgrade works. (4) Construction of 150kW photovoltaic (PV) solar panels on ground mounted frames on the south-east area of the site. The grid connected to PV panels will be arranged in 5 no. rows with an overall panel area of 745sqm approximately. Provision of a kiosk/modular unit for associated electrical equipment. (5) All associated site development works above and below ground.
The brief summarizes the pattern across all 130 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21/6609The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief